What are electrical first fix and second fix?

Understand electrical first-fix and second-fix stages in a renovation, what happens at each stage, and how to coordinate trades.

Short answer

First fix is the early stage when electrical routes and concealed cables are installed before walls and ceilings are finished; second fix is when accessories, fittings and equipment are connected after surfaces are ready. The exact sequence depends on the project, but planning positions and coordinating access before plastering prevents avoidable changes. A qualified electrician should manage electrical work, testing and the appropriate completion documentation.

What first fix involves

First fix usually takes place after the layout is established and before plasterboard, plaster or other finishes conceal the building structure. The electrician marks out points and routes, installs appropriate cables and containment, and prepares positions for sockets, switches, lighting, appliances, data and other specified systems. The work needs to reflect the agreed room plan, equipment and circuit design. It is not simply a matter of running cable wherever a route looks convenient.

At this stage, confirm final positions for furniture, kitchen units, sanitaryware, appliances and lighting. Changes later can mean access through completed finishes or visible surface routes. The electrician may coordinate with the builder to drill or notch structural elements only where permitted and appropriate; building structure must not be altered casually. Before the work is covered, agree how routes will be protected, recorded and inspected, and who gives the go-ahead for closing walls.

What happens at second fix

Second fix generally follows plastering and other dusty or wet construction work, when surfaces are ready for accessories. The electrician fits items such as sockets, switches, light fittings, connection plates and controls, makes final connections, and checks that equipment is installed as designed. Some equipment, including specialist appliances or controls, may be fitted by another trade with the electrician coordinating the electrical connection. The project specification determines the boundary of each contractor's work.

Second fix is not just cosmetic finishing. Connections must be made correctly, accessories suited to their location, and the installation verified as appropriate. If the agreed product is unavailable or has changed, check compatibility before fitting. Protect newly fitted accessories from decorators and other trades, and ensure the electrician can return for final checks after all relevant circuits and equipment are complete. Ask what remains outstanding if some fittings are deferred until after handover.

The stages between and coordination

A renovation may include several intermediate visits: reviewing the first-fix layout, adjusting points after cabinetry is set, preparing for specialist equipment, or completing testing in stages. The labels do not define every project's programme. A written scope should identify what the electrician supplies, what the client supplies, who installs decorative fittings, and who coordinates appliances, alarms, data and controls. Share revisions promptly rather than relying on verbal changes passed between trades.

Sequence work so one trade does not undo another's work. The electrician needs access before walls close and again when surfaces are ready; the plasterer needs to know where boxes and cables are; kitchen fitters need accurate appliance feeds and positions. The site lead should coordinate access and protect installed work. Keep a current plan and record approved changes, including any moved socket or omitted lighting point, so the final layout matches the design and documentation.

Inspection, testing and records

Before concealed work is covered, check that agreed points are in the intended locations and that routes have been recorded. The electrician should carry out appropriate inspection and testing at the relevant stages and at completion. The scope and type of work determine which certificates or reports apply. Ask the electrician to explain what documentation will be supplied, what it covers, and whether any building-regulation notification is required. In England, Part P applies to certain electrical work in dwellings; the correct compliance route depends on the job.

BS 7671 provides the requirements for electrical installation design, construction and verification. Completion records are useful for future maintenance and alterations, so keep them with renovation plans, equipment instructions and any marked-up cable routes. Do not treat a visual check by the homeowner as a substitute for electrical testing. If other contractors connect equipment or make changes after the electrician's tests, clarify whether further inspection or verification is needed before the system is relied upon.

Mistakes to avoid

A frequent mistake is leaving point locations until plastering or cabinetry is underway. Another is expecting the electrician to infer a design from an old plan after the client has changed the layout. Confirm positions on site, including heights and which side of a doorway or unit each accessory belongs. Avoid changing supplied fittings or appliances without checking their electrical requirements and dimensions. A small late change can affect cable routes, circuit loading and the work of other trades.

Do not cover first-fix work before the agreed inspection and recording steps are complete. Avoid storing materials against cables or allowing later drilling without route information. Do not assume that second fix means the whole job has been tested and signed off if some equipment is still missing. Before handover, request an explanation of what is complete, what remains, how controls operate and which documents will follow.

  • Do not finalise first-fix routes before agreeing the room and appliance layouts.
  • Do not let walls close before required checks and route records are complete.
  • Do not change fittings or equipment without checking compatibility and requirements.
  • Do not assume an unfinished installation has been fully inspected, tested or documented.

When to call a registered electrician

  • Involve an electrician before renovation plans and wall layouts are fixed.
  • Arrange first-fix planning before plasterboard, plaster or flooring conceals routes.
  • Contact the electrician when kitchen, bathroom or furniture layouts change.
  • Ask who is responsible for appliance connections, controls and decorative fittings.
  • Request completion testing and applicable certificates before treating the work as finished.

David J Farrar & Associates are Part P, NAPIT and NICEIC registered with over 35 years' experience across Blackheath, Lewisham, Greenwich, Bexley and North Kent. Call 07977 519533 or send an enquiry for a free, fixed quotation.

Related services

  • Full or Partial Rewires — Complete and partial rewires for houses, flats and commercial premises — planned carefully around occupied homes.
  • Additional Lighting Points — New ceiling lights, wall lights, two-way switching and feature lighting.
  • Additional Sockets — More sockets where you need them — fewer extension leads, less overloading.

Frequently asked questions

Does first fix happen before plastering?

Usually, because concealed cable routes and boxes need to be installed before walls and ceilings are finished. The precise sequence depends on the construction and agreed programme.

Is second fix the final electrical test?

Second fix includes fitting and connecting accessories, but inspection and testing requirements depend on the work and stage. Confirm with the electrician what testing and documentation remain.

Who decides socket and light positions?

The client or designer should agree the layout with the electrician and relevant trades. Confirm positions against furniture, cabinetry and appliances before first fix.

What documents should I ask for?

Ask the electrician which certificate or report applies to the work, what it covers, and whether Part P notification is required in England. Keep records with plans and instructions.

Official sources

Need this sorted? Get a free, fixed quote from a registered local electrician.

07977 519533Enquire online

This guide is general information about UK electrical regulations and good practice, and any prices are indicative only. For advice on your property, speak to a registered electrician.

Talk to an electrician today

Free quotations · No hidden fees · Domestic & commercial

Call nowFree quote