Short answer
Plan an outbuilding supply around its intended equipment, distance from the house, environment and future use. A qualified, registered electrician should assess the existing installation and design the supply, protection and earthing. Agree routes and responsibilities before construction or landscaping; a permanent shed or garden-room supply is not a job for an improvised extension lead.
Describe how the outbuilding will actually be used
A shed used for occasional storage has different requirements from an insulated garden office or a workshop. List the equipment you expect to use, including lighting, computers, heating, kettles, refrigeration and tools. State which items may operate together. A detached garage fits the same planning approach where it serves similar storage or workshop needs, but vehicle charging needs separate assessment.
Future intentions matter, but they should be specific. Tell the electrician if you expect a heater, larger workshop machine or additional room later. A vague request to make everything future-proof cannot define an appropriate supply. Equally, installing extra socket outlets does not increase available capacity; the design must account for the actual loads and their likely simultaneous use.
Assess the house supply and proposed electrical demand
The electrician needs to assess the existing installation, including supply characteristics, relevant circuit capacity, earthing, bonding and protective devices. An apparently spare way in the consumer unit does not prove that a new outbuilding circuit can simply be added. Condition, suitability and the combined demand of the house and outbuilding all influence the proposed arrangement.
Distance affects design because the cable must perform properly under load and allow protective measures to operate as intended. Cable size cannot be selected from distance alone, nor from a neighbour’s installation. The installer must consider the chosen route, installation method, loading, voltage drop and fault protection together. Ask for an explanation of the proposal rather than prescribing a cable size yourself.
Agree the route before groundworks and landscaping
Walk through the proposed route with the electrician and whoever is responsible for paths, patios and foundations. Identify other services, drainage, tree roots and areas likely to be dug in future. The route must also work at building entries, where cables need suitable protection and weather-resistant detailing. A short straight line is not always the most suitable route.
Do not excavate to a generic online depth or buy cable before the design is agreed. Burial arrangements and mechanical protection depend on the site and installation requirements; there is no single figure that settles every domestic garden. Agree who locates existing services, carries out groundworks, inspects the route before concealment and reinstates surfaces. Keep an accurate record of the completed route.
Let the electrician design earthing and protection
Outbuilding earthing is a design issue, particularly where there are metal structures, incoming services or other conductive parts. Different arrangements may be appropriate depending on the supply and circumstances. An earth electrode is not automatically required for every shed, nor is extending the house earthing automatically suitable for every outbuilding. Do not choose the arrangement from a diagram online.
RCD protection is important but does not replace sound wiring, suitable overcurrent protection or effective earthing. The electrician should consider device selection and coordination so the arrangement provides the required protection and sensible operation. Discuss whether an outbuilding fault could unnecessarily interrupt house circuits, and how the supply can be safely isolated for maintenance without relying on an unclear label.
Position sockets, lighting and controls for real use
Mark a furniture and equipment layout before the walls are lined. Place sockets where they will remain accessible, accounting for desks, benches, shelving and doors. Plan lighting for movement and tasks without deep shadows or glare on screens. A storage shed may need a straightforward arrangement, while a garden room may benefit from separate task and background lighting.
Equipment must suit the environment. An unheated shed can be damp or dusty even when rain does not enter directly, while an insulated room has different conditions. Outdoor accessories and external lights need appropriate weather protection for their exposure. Electrical Safety First’s outdoor-lighting advice explains why suitability and professional installation matter; an IP marking alone does not resolve every environmental or mechanical risk.
Coordinate data, completion and the handover
If the building will be used for work, plan the data connection alongside power rather than assuming Wi-Fi will cross the garden reliably. The electrical and data routes need appropriate separation and suitable installation methods. Agree cable entries, any network points and responsibilities with the relevant installer before walls or landscaped surfaces are finished. Do not assume power and data can share any available duct.
New electrical work should meet the applicable requirements of BS 7671 and be inspected and tested before use. In England, a new circuit supplying a domestic outbuilding is normally notifiable under Part P. Agree the notification route before work begins and request the Electrical Installation Certificate and, where required, Building Regulations compliance documentation. Planning permission and other building requirements are separate from electrical certification.
Mistakes to avoid when commissioning the supply
Ask for a written scope showing intended loads, circuit arrangements, outlets, lighting, route assumptions, groundworks and making good. Keep equipment instructions, circuit information and route records with the completion documents. If the building’s use later changes, have the supply reassessed before adding substantial equipment rather than assuming the original design covers every possible future activity.
- Using a temporary extension arrangement as the permanent supply.
- Choosing cable size or burial details before the site has been assessed.
- Ordering heaters and workshop equipment without declaring their demand.
- Finishing walls or landscaping before routes, entries and checks are agreed.
When to call a registered electrician
- Involve an electrician before ordering the building, closing wall linings or starting the supply route.
- Stop using damaged, water-affected or repeatedly tripping outbuilding electrics and arrange assessment rather than repeatedly resetting protection.
David J Farrar & Associates are Part P, NAPIT and NICEIC registered with over 35 years' experience across Blackheath, Lewisham, Greenwich, Bexley and North Kent. Call 07977 519533 or send an enquiry for a free, fixed quotation.
Related services
- Shed & Garden Supplies — Safe, armoured supplies to sheds, workshops, garden rooms and garages.
- Garden Lighting & Power — Outdoor sockets, security lights and garden lighting installed with the right protection.
- Data Networks & Comms Upgrades — Structured data cabling, network points and comms upgrades for homes and offices.
Frequently asked questions
Can an existing outdoor socket supply my garden room?
Do not assume so. Its circuit, protection and intended use may not suit a permanent building or its combined loads. Give the electrician the equipment list and proposed use so the whole arrangement can be assessed, rather than adding adapters or an extension as a permanent solution.
Does every shed need its own consumer unit?
No universal arrangement suits every outbuilding. The number of circuits, intended loads, isolation and protective design determine what is appropriate. A small lighting requirement and a multi-use workshop can justify different solutions; an additional box alone does not establish a safe installation.
Can I add electric heating later?
Only if the supply and circuits are suitable for the additional demand. Heating can materially change simultaneous loading, especially alongside kettles or tools. Declare likely heating requirements during design, and arrange reassessment before adding equipment that was not allowed for in the original plan.
Is electrical certification proof the garden room needs no other approvals?
No. Electrical certification records the electrical work within its scope. Planning rules, building control matters, structural requirements and any restrictions on the building’s use are separate. Confirm those requirements with the relevant authority or adviser rather than treating an electrical certificate as general permission.
Official sources
Need this sorted? Get a free, fixed quote from a registered local electrician.
07977 519533Enquire onlineThis guide is general information about UK electrical regulations and good practice, and any prices are indicative only. For advice on your property, speak to a registered electrician.