Short answer
Plan kitchen electrics from the final layout, appliance schedule and day-to-day routines before ordering units or closing walls. Agree socket, lighting and control positions with the kitchen designer and a qualified electrician, who can assess the existing installation and any required alterations.
Fix the layout and appliance schedule early
Start with a dimensioned plan showing cabinets, worktops, sink, doors, windows, extractor position and appliance locations. List each appliance, its manufacturer requirements and whether it is fixed, integrated or likely to change. Include small appliances used on the worktop, such as a kettle or coffee machine, so socket positions support real use rather than simply filling available wall space.
Ask the kitchen supplier for final unit drawings and confirm any changes before electrical first-fix work begins. A tall unit, splashback, drawer or upstand can make a planned accessory inaccessible. Note service voids, ventilation openings and removable panels. Coordinate with plumbing and ventilation trades so electrical routes and connections do not conflict with pipework, ducting or access for maintenance.
Map sockets to routines and furniture
Think through how people prepare food, clean and charge devices. Worktop sockets should be accessible without placing leads over hot surfaces, sinks or busy walkways. Consider sockets for appliances that are used occasionally, and confirm whether they can be reached without moving heavy equipment. A clear plan can reduce reliance on adaptors and trailing extensions.
There is no universal socket count that suits every kitchen. The room size, layout, appliance mix and household routines all matter. Discuss positions with the electrician and check how switches, drawers and doors will work around them. For integrated appliances, clarify whether the connection needs to be accessible for isolation and servicing, and follow the appliance manufacturer's instructions.
Plan layered lighting
A practical scheme usually combines general room lighting with useful illumination on work surfaces. Under-cabinet lighting can reduce shadows from wall units; pendant or decorative lighting may suit an island or dining area. Consider where the light falls when a person stands at the worktop, and whether fittings or shelves will create shadows or glare.
Agree switching and dimming zones so the room can support food preparation, cleaning and relaxed use. Controls should be easy to reach when entering the room and should not be hidden behind a door or appliance. Confirm that dimmers, LED drivers and fittings are compatible. If the kitchen includes a glazed extension or rooflights, consider daylight changes and whether separate zones would be useful.
Check the existing installation and planned work
Before work starts, ask for the existing electrical installation to be reviewed, especially if the property is older, the consumer unit has limited capacity or there are signs of damage. The electrician can assess circuits, earthing and bonding where relevant, protective devices, available capacity and the scope of alterations. An inspection is not a substitute for agreeing the new layout, but it can identify issues that affect the programme.
Clarify which work is new, altered or retained, and what testing and documentation will be provided. Requirements depend on the work and location; in England, some electrical work in dwellings is subject to Part P building regulations. A qualified electrician can explain applicable notification and certification. BS 7671 is the wiring standard electricians use, but design decisions must be made for the actual installation rather than copied from a generic plan.
Sequence trades and protect access
Agree the order of work with the kitchen fitter, electrician, plasterer and other trades. Electrical routes and back boxes may need to be installed before surfaces are finished, while final connections and fitting installation happen later. Mark agreed positions on site and check them against the units before drilling or closing up. Keep a record of routes before they are concealed.
Make a commissioning and handover plan. Confirm who supplies decorative fittings, drivers, appliance connections and controls, and who is responsible for testing. Ensure access remains to junctions and service points where required. Appliance installers may have specific connection instructions; share these with the electrician early rather than relying on assumptions on installation day.
Mistakes to avoid
Most avoidable issues result from making electrical decisions before the kitchen layout is final. A small change to a tall unit, island or splashback can affect both accessibility and the appearance of an accessory. Treat the electrical plan as part of the room design and review it against final drawings.
Avoid these common oversights:
- Ordering units before confirming appliance and socket positions.
- Placing outlets where drawers, doors or splashbacks obstruct them.
- Relying on extension leads because worktop use was not considered.
- Leaving lighting controls in awkward or inaccessible positions.
- Forgetting service access for appliance connections and drivers.
- Changing the layout after first-fix without telling the electrician.
- Assuming existing circuits are suitable without assessment.
Handover and future flexibility
At completion, ask for a demonstration of switches, dimmers and any smart controls. Keep the final electrical plan, test documentation, appliance instructions and details of replacement lamps or drivers. Confirm which circuits or isolators serve the kitchen equipment, and make sure labels are clear. A marked-up plan of concealed routes can also help future work, although it does not replace safe detection before drilling.
Consider likely future changes such as replacing an appliance or adding a water filter or waste unit. Sensible access and a little planning flexibility can prevent disruptive alterations, but avoid installing unnecessary equipment without a defined purpose. If a fault develops, stop using affected equipment and call a qualified electrician rather than opening accessories or attempting repairs.
When to call a registered electrician
- Before final kitchen drawings are approved, to coordinate outlets and lighting.
- If the existing installation is old, damaged or has insufficient apparent capacity.
- Before first-fix work, unit installation or wall finishes conceal electrical routes.
- When controls, integrated appliances or specialist lighting need coordination.
- For testing, certification or clarification of building-regulation requirements.
David J Farrar & Associates are Part P, NAPIT and NICEIC registered with over 35 years' experience across Blackheath, Lewisham, Greenwich, Bexley and North Kent. Call 07977 519533 or send an enquiry for a free, fixed quotation.
Related services
- Additional Sockets — More sockets where you need them — fewer extension leads, less overloading.
- Additional Lighting Points — New ceiling lights, wall lights, two-way switching and feature lighting.
- Repairs, Maintenance & Fault Diagnosis — Tracing trips, dead circuits, burning smells and flickering lights — and fixing them properly.
Frequently asked questions
When should I involve an electrician in a kitchen refit?
Involve one while the layout and appliance schedule are being developed, and before first-fix work or finishes conceal routes. Early coordination helps check access, circuit suitability and the proposed positions against the actual units.
How many kitchen sockets do I need?
It depends on the room, appliance list and how you use the worktop. Map everyday and occasional appliances, then agree practical positions with the kitchen designer and electrician rather than relying on a standard number.
Can I keep the existing kitchen circuits?
Possibly, but an electrician needs to assess the installation, planned loads, circuit condition and protection. The answer depends on the existing wiring and the scope of the refit; do not assume the previous arrangement remains suitable.
Does a kitchen refit need electrical certification?
The appropriate inspection, testing and documentation depend on the work carried out. In England, certain electrical work in dwellings is subject to Part P requirements. Ask the electrician beforehand what certification and any notification apply to your project.
Official sources
Need this sorted? Get a free, fixed quote from a registered local electrician.
07977 519533Enquire onlineThis guide is general information about UK electrical regulations and good practice, and any prices are indicative only. For advice on your property, speak to a registered electrician.

