House rewire costs in London: budgets and timelines

Budget for a London house rewire with indicative costs by property size, realistic timescales, scope checks and advice for occupied period homes.

Short answer

For planning only, a modest London flat might need £3,500–£6,500 for a full electrical rewire, while a three-bedroom house might need £6,500–£11,000 and larger homes £10,000–£18,000 or more. Actual prices depend on access, circuit count and specification, not bedroom count alone. Electrical work can take several days to several weeks, with plastering, decoration and permissions extending the overall programme.

Indicative London rewire budgets by property size

Treat the following figures as broad planning allowances for domestic electrical work, not published market averages, a schedule of rates or a quotation from David. They assume a conventional specification, reasonable access and a replacement consumer unit, and exclude plastering and decorating unless specifically included. VAT treatment must be checked in each written quote: ask for the total amount you will actually pay.

A one-bedroom flat might fall around £3,500–£6,500; a two-bedroom flat or small house around £4,500–£8,000; a three-bedroom house around £6,500–£11,000; and a four-bedroom house around £8,500–£14,000. A substantial five-bedroom property or complicated period home may require £10,000–£18,000 or more. These overlapping ranges deliberately reflect how strongly layout, finish and access influence cost.

A compact flat with concrete floors and extensive fitted furniture can take more work than a larger empty house with accessible timber floors. Likewise, a basic four-bedroom layout is not equivalent to a property with multiple bathrooms, electric heating and extensive feature lighting. Use the allowances to start a conversation, then obtain a surveyed fixed quotation. David gives free fixed quotes against an agreed scope.

Deciding whether a full rewire is necessary

Age alone does not establish that every cable must be replaced. The condition of insulation, protective conductors, circuit arrangements and previous alterations matters. Electrical Safety First explains that periodic inspection identifies damage, deterioration and potentially dangerous conditions. An EICR can help distinguish targeted repairs, a partial rewire and wholesale replacement when the evidence is unclear.

If a full rewire is recommended, ask what is being replaced and why. Does the description include every final circuit, outbuilding supply and fixed alarm circuit, or are some recent circuits being retained? Retaining suitable wiring may be reasonable, but the quotation and certificate must describe the actual work. A consumer-unit change with new accessories is not automatically a full rewire, even if the finished rooms look renewed.

What belongs in the electrical specification

Prepare a room-by-room schedule of sockets, switches, ceiling points, wall lights and dedicated appliance supplies. Include the position of beds, desks, televisions and kitchen appliances rather than simply asking for plenty of sockets. Note any electric shower, immersion heater, extractor fan, garden building or heating system. The electrician can then assess demand, circuit arrangements and protection instead of guessing from the number of bedrooms.

A normal full-rewire scope covers new agreed cables, boxes, accessories, suitable consumer-unit equipment, inspection, testing and certification. Clarify light fittings, smoke and heat alarms, data cabling, doorbells, outdoor supplies and any specialist controls separately. The quantity and finish of accessories can materially change the price. Decorative fittings supplied by the customer still need time, safe support and compatible controls.

Agree whether the specification includes RCBOs, surge protection and any applicable AFDD provision. Equipment must suit the design standard and the property’s use, not merely a marketing label such as premium board. Spare enclosure space can help future planning, but does not guarantee the incoming electricity supply has capacity for every possible future appliance. Ask for provision based on realistic plans.

A realistic timeline by size and access

As indicative electrical working periods, a small empty flat may take roughly three to six working days, a two-bedroom property five to eight, and a straightforward three-bedroom house about seven to twelve. A four- or five-bedroom house may need ten to twenty working days or more. Team size, layout and the extent of fittings change these figures, so they are not guaranteed completion promises.

These are working-time allowances, not necessarily consecutive calendar days. First fix is followed by other trades and then second fix, testing and any final adjustments. Allow additional time for plaster drying, kitchen installation, decoration and delivery of chosen fittings. Listed-building permissions, freeholder approvals, access bookings and utility work should be resolved before the programme is treated as firm.

Ask for milestone dates: start, first-fix completion, access for plasterers, second fix and handover. Identify who can approve changes and what happens if another trade is delayed. A short advertised rewire time can exclude the period when walls remain unfinished. Plan from the date you need a habitable, decorated home, not only the date when cables are installed.

First fix, second fix and testing

First fix establishes safe cable routes, installs boxes and runs cables before finishes are restored. It can involve lifting selected boards and chasing suitable walls, making it the dusty, disruptive stage. Structural limitations, fire separation and buried-service hazards must be considered. Do not instruct an electrician to cut historic plaster, joists or structural elements simply because a shorter route appears cheaper.

Second fix fits the agreed switches, sockets, lighting connections and consumer-unit equipment once relevant surfaces are ready. Inspection and testing confirm the installation’s protective arrangements and produce the records needed for certification. Avoid booking the decorator’s final visit before positions, accessories and any snagging have been checked. A written change to a socket position late in the process can mean fresh damage and additional cost.

Living in the property and managing disruption

An occupied rewire needs a specific plan for safe temporary arrangements, access, dust and daily handover. It may be possible to remain, but it is not always practical, especially with young children, restricted mobility or medical equipment. Do not assume power, cooking facilities and lighting will remain available everywhere each evening. Agree exactly which areas and services can safely remain usable.

Clear rooms and storage areas before the agreed date, while leaving heavy furniture movements and floor protection responsibilities clear in the quote. Tell the contractor about pets, alarm systems, broadband requirements and working hours. If flooring cannot be lifted without specialist help, arrange that help beforehand. Temporary accommodation, storage and cleaning can form part of the real household budget even when they are outside the electrical contract.

London period houses, conversions and hidden extras

Blackheath and Greenwich contain period homes where original cornices, lath-and-plaster ceilings and retained floorboards deserve careful treatment. Routes should be agreed before intrusive work. In Lewisham conversions, shared walls, fire-resisting floors and communal meter cupboards require coordination. A new cable route must not compromise the separation between flats or rely on access to a neighbour’s property that has not been agreed.

Suspected asbestos, damaged subfloors, extensive making good and inaccessible voids can change the plan. The electrician should stop and seek an appropriate arrangement rather than disturb suspect materials. Lease conditions, managing-agent permissions and listed-building consent are separate considerations from electrical compliance. Surface routing may occasionally be the safest or least damaging option; concealed wiring is not always the right design objective.

Budget separately for plastering, painting, replacement flooring and any kitchen or bathroom dismantling. Decide whether the electrician coordinates these trades or simply leaves agreed chases ready for others. Avoid treating an arbitrary contingency percentage as a guarantee: identify the actual unknowns at survey and require approval of priced variations before non-emergency additional work proceeds.

Quotations, notification and final handover

Compare quotations against the same room schedule and inclusions. Ask about VAT, waste removal, payment milestones, working hours, access assumptions, testing and documents. A clear fixed quote is for a defined job; changing the design can legitimately change the price. Record variations in writing so the final bill does not depend on recollections of conversations made while rooms were stripped out.

GOV.UK’s Approved Document P explains notification for new circuits and consumer-unit replacements in England. A full domestic rewire will normally require notification, commonly through a suitably registered installer’s Competent Person Scheme. At handover obtain the Electrical Installation Certificate with schedules and test results, circuit identification and the separate Building Regulations compliance documentation. Keep these with drawings and product information.

Walk through the agreed points, check accessories and lighting controls, and ask how protective-device testing should be carried out. Confirm any retained circuits and unresolved items in writing. Wales has different notification rules and Scotland has its own building standards process; these London-focused allowances and procedures should not be assumed to cover a project elsewhere without local advice.

When to call a registered electrician

  • An EICR identifies widespread wiring deterioration or unsafe alterations.
  • You are planning a refurbishment that will open floors and walls.
  • Existing circuits cannot safely support the planned kitchen or heating layout.
  • There are burning smells, damaged accessories or recurring unexplained trips.
  • You need a property-specific budget before buying or renovating a period home.

David J Farrar & Associates are Part P, NAPIT and NICEIC registered with over 35 years' experience across Blackheath, Lewisham, Greenwich, Bexley and North Kent. Call 07977 519533 or send an enquiry for a free, fixed quotation.

Related services

Frequently asked questions

Is rewiring priced per bedroom or per electrical point?

Neither measure tells the whole story. Bedrooms can help with initial budgeting, while point counts help define scope, but access, routing, circuits and finishes still matter. Ask for a surveyed price based on a written room schedule rather than multiplying an advertised unit rate.

Does a rewire quote normally include plastering?

Not always. Some contractors include limited making good and others leave chases for your plasterer. Ask about full-wall skimming, matching period plaster, decoration, flooring and cleaning separately. The written scope should distinguish electrical completion from a fully finished room.

Can I rewire one room at a time?

Sometimes a staged or partial rewire is practical, but circuits do not always follow room boundaries. Repeated access, temporary connections and testing can increase the overall labour. Ask for a planned sequence that leaves each stage safe and clearly documented.

Should I have the rewire done before a new kitchen?

Usually cable routes, circuit capacity and appliance positions should be designed before the kitchen is fitted. Coordinate final measurements with the kitchen installer and electrician. Retrofitting additional supplies after units, worktops and tiling are complete is likely to be more disruptive.

Will a rewire reduce my electricity bill?

Not automatically. The main benefits are safety, suitability and convenient provision. Energy savings depend on equipment and use, such as efficient lighting or controls. Do not rely on promised bill reductions to justify replacing otherwise sound wiring without an assessment.

Official sources

Need this sorted? Get a free, fixed quote from a registered local electrician.

07977 519533Enquire online

This guide is general information about UK electrical regulations and good practice, and any prices are indicative only. For advice on your property, speak to a registered electrician.